In order to reduce the demand for fresh steam, reduce the energy consumption in the evaporation concentrating project and reduce the operation cost, the multi effect evaporator can be reconstructed to a MVR multi effect evaporator.
S/N | Before modification (Four effect evaporator) | After modification (MVR Evaporator) |
---|---|---|
Steam cost | 1875RMB/h (7.5tons/h, 250RMB/tons) |
125RMB/h (0.5tons/h, 250RMB/tons) |
Power cost | 80RMB/h (100Kw.h, 0.8RMB/Kw.h) |
480RMB/h (600Kw.h, 0.8RMB/Kw.h) |
Cooling water cost | 600RMB/h (200tons/h, 3RMB/tons) |
60RMB/h (20tons/h, 3RMB/tons) |
Total cost | 2555RMB/h | 335RMB/h |
Total cost | 1533million RMB (1years, about 6000hours) |
201million RMB (1years, about 6000hours) |
Energy saving effect | 86% |
In order to reduce the demand for fresh steam, reduce the energy consumption in the evaporation concentrating project and reduce the operation cost, the multi effect evaporator can be reconstructed to a MVR multi effect evaporator.
S/N | Before modification (Four effect evaporator) | After modification (MVR Evaporator) |
---|---|---|
Steam cost | 1875RMB/h (7.5tons/h, 250RMB/tons) |
125RMB/h (0.5tons/h, 250RMB/tons) |
Power cost | 80RMB/h (100Kw.h, 0.8RMB/Kw.h) |
480RMB/h (600Kw.h, 0.8RMB/Kw.h) |
Cooling water cost | 600RMB/h (200tons/h, 3RMB/tons) |
60RMB/h (20tons/h, 3RMB/tons) |
Total cost | 2555RMB/h | 335RMB/h |
Total cost | 1533million RMB (1years, about 6000hours) |
201million RMB (1years, about 6000hours) |
Energy saving effect | 86% |